Printed on the pack (m² per pack).
Standard 5% – plan 10–15% for diagonal installation or many cuts.
Packs needed
9packs
9For 20 m² you need 9 packs of 2.5 m² – 21 m² including 5% cutting waste.
Amount bought: 22.5 m²
Buy all packs from the same batch (same batch number). Colour differences between batches can be visible.
Laminate Flooring Calculator by Rechnerzentrale(opens in a new tab)